Structure Access 21 State
The Structure Access page of CLEC Online has been updated to make it more user friendly and easier to find what you are looking for.
Just click on the link in the "I Want To..." section to be taken to that topic.
I Want To...
- Agreement
- Requests
- Access the AT&T Facility Portal
- Request AT&T pole or conduit records
- Submit a standard Structure Access attachment request
- Submit a One Touch Make Ready (OTMR) Structure Access attachment request
- Submit a notification to overlash an existing attachment
- Submit a request to rebuild an existing attachment
- Access an AT&T manhole for maintenance or presurvey work
- Submit a request for an emergency conduit reservation
- Request make ready for AT&T attachments on a non-AT&T owned pole
- Notify AT&T of One Touch Make Ready construction start or completion affecting AT&T attachments on foreign owned (FO), non-AT&T poles
- Invoke the self-help remedy for make-ready work affecting AT&T attachments
- Notify AT&T of my removal of attachment(s)
- Access the AT&T Facility Portal
- Authorized Contractors
- Other
Negotiate a new Structure Access Agreement
If you would like to enter into a Structure Access Agreement with AT&T in order to attach to AT&T’s structures, please follow the appropriate process below based on the type of provider you are:
- Competitive Local Exchange Carrier (CLEC), Wireless Carrier (CMRS), Cable TV Provider (CATV), and Broadband Internet Access Service Provider (BIAS) will follow the process listed below:
- Complete the Structure Access Negotiations Request Form.
- Submit the completed form along with any required documentation to the Negotiations Request Team at m41654@att.com.
- If you are not one of the providers listed above in item 1, follow the process listed below:
- Complete the Structure Access Negotiations Request Form.
- Submit the completed form along with any required documentation to the AT&T National Joint Utility Team at g13922@att.com.
Amend my existing Structure Access Agreement
If you have an existing Structure Access Agreement with AT&T in order to attach to AT&T’s structures and want to amend that agreement, please follow the appropriate process below based on the type of provider you are:
- Competitive Local Exchange Carrier (CLEC), Wireless Carrier (CMRS), Cable TV Provider (CATV), and Broadband Internet Access Service Provider (BIAS) will follow the process listed below:
- Complete the Structure Access Negotiations Request Form.
- Submit the completed form along with any required documentation to the Negotiations Request Team at m41654@att.com and indicate in the body of the email that you want to amend your existing agreement.
- If you are not one of the providers listed above in item 1, follow the process listed below:
- Complete the Structure Access Negotiations Request Form.
- Submit the completed form along with any required documentation to the AT&T National Joint Utility Team at g13922@att.com and indicate in the body of the email that you want to amend your existing agreement.
Assign my Structure Access Agreement and/or assets to another company
If you are an existing attacher on AT&T structure and would like to assign the existing Structure Access Agreement with AT&T and/or the occupancy permit(s) issued by AT&T pursuant to the existing Structure Access Agreement to another company, please follow the appropriate process below based on the type of provider you are:
- Competitive Local Exchange Carrier (CLEC), Wireless Carrier (CMRS), Cable TV Provider (CATV), and Broadband Internet Access Service Provider (BIAS) will follow the process listed below:
- Complete the Assignment Request Form.
- Submit the completed form along with any required documentation to the Negotiations Request Team at m41654@att.com.
- If you are not one of the providers listed above in item 1, follow the process listed below:
- Complete the Assignment Request Form.
- Submit the completed form along with any required documentation to the AT&T National Joint Utility Team at g13922@att.com.
Change my company's name on my existing agreement and within AT&T's systems
If you have an existing Structure Access Agreement with AT&T in order to attach to AT&T’s structures and want to amend that agreement change the name of company listed in the agreement and AT&T’s systems, please follow the appropriate process below based on the type of provider you are:
- Competitive Local Exchange Carrier (CLEC), Wireless Carrier (CMRS), Cable TV Provider (CATV), and Broadband Internet Access Service Provider (BIAS) will follow the process listed below:
- Complete the Structure Access Negotiations Request Form.
- Submit the completed form along with any required documentation to the Negotiations Request Team at m41654@att.com and indicate in the body of the email that you want to amend your existing agreement.
- If you are not one of the providers listed above in item 1, follow the process listed below:
- Complete the Structure Access Negotiations Request Form.
- Submit the completed form along with any required documentation to the AT&T National Joint Utility Team at g13922@att.com and indicate in the body of the email that you want to amend your existing agreement.
Contact the local AT&T Structure Access Team
Current contacts for the AT&T Structure Access Team can be found here: Points of Contact for Structure Access
Add, update, or remove authorized contacts for my company
Only those individuals listed in AT&T’s system as an authorized contact for your company will be allowed to act on your company’s behalf associated with your Structure Access Agreement. To add, remove, or update an authorized contact for your company, please follow the process listed below:
NOTE: It is very important that your contacts are up to date to ensure that you are receiving notices sent out from AT&T concerning AT&T structure access.
- Complete the Letter of Authorization for Applications, Record Reviews, Billing, & Notices (LOA) for all contacts to be added, removed, or edited.
- Submit the completed form to the appropriate contact listed in the Points of Contact for Structure Access.
Access the AT&T Facility Portal
The AT&T Facility Portal provides access to AT&T solely owned and jointly owned pole data in California and Nevada. This pole data is currently only available to the following groups: California Public Utilities Commission Staff, California state and local government officials, Major Pole Owners in California, and 3rd Party Attachers within California or Nevada (requires an active structure access agreement with AT&T).
If you meet the requirements listed above and would like to request access to the AT&T Facility Portal, please follow process listed in the AT&T Facility Portal Access Instructions.
Additional information concerning the AT&T Facility Portal can be found below:
- Frequently asked questions: AT&T Facility Portal FAQ
- Security questions and AT&T's response: AT&T Facility Portal Security Questions and Response
- Glossary of terms: AT&T Facility Portal Glossary
View AT&T Structure Access guidelines
AT&T's Structure Access guideline documents are shown below:
- Structure Access Guidelines
- Guidelines for Boxing and Bracketing
- Structure Access Application Process
Request AT&T pole or conduit records
NOTE: To view AT&T pole or conduit records, you must have an active Structure Access Agreement with AT&T that includes the specific state where the facilities are located and you must be listed as an authorized contact within AT&T’s system for the company listed in the agreement.
- Complete the Records Review Request (REC-REV-002).
- Submit the completed form to the appropriate contact listed in the Points of Contact for Structure Access.
Submit a standard Structure Access attachment request
The structure access process starts when an Attaching Party notifies AT&T of its wish to access AT&T's structure.
The Attaching Party should complete all required fields on the application form(s), provide all the applicable information required on the form, and submit the request to the Local Structure Access Team.
The following table lists various types of information that an Attaching Party may be required to provide:
Pole |
---|
All drawings or maps that provide details for the location of the work to be performed, the type of work being done, and any schematics/details of facilities being placed. |
Municipality and street names/addresses, primary & subsequent placement paths, identity of subject AT&T poles including pole number(s) and latitude/longitude. |
Location, type, size, weight, height of attachment(s) and equipment being placed to include ancillary equipment, splices, and cable loops. |
Existing attachment(s) and height(s) for any attachment(s) on the pole(s). |
All make-ready work required by any existing attacher. |
Attaching Party point of contact and telephone number/email along with company doing work. |
Conduit |
---|
All drawings or maps that provide details for the location of the work to be performed, the type of work being done, and any schematics/details of facilities being placed. |
Identification of start and end of work, i.e. MH or bldg. number, street address, distance to next MH. |
Cable outside diameter (OD), cable type (copper, fiber, coaxial), number of tubes, voltage to ground and maximum current of any conductor, spare ducts/innerducts. |
Splices and/or how much slack to be placed in a MH. |
Make-ready work required with details, including knockouts or core boring required. |
Attaching Party point of contact and telephone number/email along with company doing work. |
Pole Attachment Request
- Prior to performing the make-ready survey and submitting a pole attachment request, the Attaching Party should obtain AT&T pole records for the area of interest by submitting a request for AT&T pole records.
- Complete the Application (APP-002).
- Complete the Pole Data Sheet (POLE-DATA-003) for all poles associated with the request.
- Refer to the Pole Data Sheet Instructions document for instructions on completing the Pole Data Sheet.
- Complete pole loading for each pole associated with the request. Files should contain only 1 pole per file (i.e. do not lump all poles into a single file) and each file name should start with "PLA-" (e.g. PLA-Pole1-126 Main St.pdf)
- Create a map of the proposed path that includes all poles associated with the request.
- Submit all completed documents listed above to the Local Structure Access Team.
IMPORTANT: Some areas may require additional documents beyond what is outlined above. Please reach out to the Local Structure Access Team to ensure you have all required documentation for a complete request prior to submittal.
Conduit Attachment Request
- Follow the Manhole Access process to perform the required make-ready survey of the affected manholes.
- Complete the Application (APP-002).
- Complete the Conduit Data Sheet (COND-001).
- Complete a Manhole Detail Requirements (MHDET-001) sheet for each manhole associated with the request.
- Complete a Manhole/Vault Access (MHACC-002) for each manhole associated with the request that will require entry for facility placement.
- If the request proposes core boring a manhole, complete the Request to Core Bore or Modify Manhole (CORE-002) form for each manhole where you are proposing to core bore or modify the manhole.
- Create a map of the proposed path that includes all manholes associated with the request.
- Submit all completed documents identified in items 2-7 above to the Local Structure Access Team.
IMPORTANT: Some areas may require additional documents beyond what is outlined above. Please reach out to the Local Structure Access Team to ensure you have all required documentation for a complete request prior to submittal.
Submit a One Touch Make Ready (OTMR) Structure Access attachment request
IMPORTANT: An Attaching Party wishing to request access to AT&T structure utilizing OTMR must have an existing executed agreement (Category B agreement or FCC agreement) that contains the OTMR provisions.
If you do not currently have an agreement with the OTMR provisions and would like to amend your agreement to have them added, follow the Structure Access Agreement amendment process.
The structure access process starts when an Attaching Party notifies AT&T of its wish to access AT&T's structure.
The Attaching Party should complete all required fields on the application form(s), provide all the applicable information required on the form, and submit the request to the Local Structure Access Team.
The following table lists various types of information that an Attaching Party may be required to provide:
Pole |
---|
All drawings or maps that provide details for the location of the work to be performed, the type of work being done, and any schematics/details of facilities being placed. |
Municipality and street names/addresses, primary & subsequent placement paths, identity of subject AT&T poles including pole number(s) and latitude/longitude. |
Location, type, size, weight, height of attachment(s) and equipment being placed to include ancillary equipment, splices, and cable loops. |
Existing attachment(s) and height(s) for any attachment(s) on the pole(s). |
All make-ready work required by any existing attacher. |
Attaching Party point of contact and telephone number/email along with company doing work. |
- Prior to performing the make-ready survey and submitting a pole attachment request, the Attaching Party should obtain AT&T pole records for the area of interest by submitting a request for AT&T pole records.
- View the current list of AT&T authorized contractors or Attacher authorized contractors to identify contractors approved to perform the proposed work associated with the request.
- To add an authorized contractor to the Attacher authorized contractor list, refer to the Add an Attacher authorized contractor section.
- Complete the Application (APP-002) and indicate that the request is for OTMR.
- Complete the Pole Data Sheet (POLE-DATA-003) for all poles associated with the request.
- Refer to the Pole Data Sheet Instructions document for instructions on completing the Pole Data Sheet.
- Complete pole loading for each pole associated with the request. Files should contain only 1 pole per file, i.e. do not lump all poles into a single file.
- Create a map of the proposed path that includes all poles associated with the request.
- Submit all completed documents listed above to the Local Structure Access Team.
Once permitted by AT&T to attach and perform the approved One Touch Make Ready on an AT&T pole (or AT&T owned grade on a jointly owned pole), Attaching Party must provide notification of the start date and completion date of all make-ready work performed on AT&T attachments as follows:
- Prior to performing the permitted make-ready on AT&T attachments located on an AT&T pole (or AT&T owned grade on a jointly owned pole), Attaching Party will complete the AP Notification of MR Construction Start date ATT Poles form and submit it to the issuer of the permit.
- Upon completion of the permitted make-ready on AT&T attachments located on an AT&T pole (or AT&T owned grade on a jointly owned pole), Attaching Party will complete the AP Notification of MR Construction Complete date ATT Poles form and submit it to the issuer of the permit.
IMPORTANT: Some areas may require additional documents beyond what is outlined above. Please reach out to the Local Structure Access Team to ensure you have all required documentation for a complete request prior to submittal.
Submit a notification to overlash an existing attachment
- Complete the Notification to Overlash/Rebuild (NOR) form.
- If the form indicates pole loading is required, complete pole loading for each pole associated with the notification. Files should contain only 1 pole per file, i.e. do not lump all poles into a single file.
- Create a map of the proposed path that includes all poles associated with the notification.
- Submit all completed documents listed above to the Local Structure Access Team.
IMPORTANT: Some areas may require additional documents beyond what is outlined above. Please reach out to the Local Structure Access Team to ensure you have all required documentation for a complete request prior to submittal.
Submit a request to rebuild an existing attachment
- Complete the Notification to Overlash/Rebuild (NOR) form.
- If the form indicates pole loading is required, complete pole loading for each pole associated with the notification. Files should contain only 1 pole per file, i.e. do not lump all poles into a single file.
- Create a map of the proposed path that includes all poles associated with the notification.
- Submit all completed documents listed above to the Local Structure Access Team.
IMPORTANT: Some areas may require additional documents beyond what is outlined above. Please reach out to the Local Structure Access Team to ensure you have all required documentation for a complete request prior to submittal.
Access an AT&T manhole for maintenance or presurvey work
- Complete the Manhole/Vault Access (MHACC-002) form.
- Create a map of the proposed path that includes all manholes/vaults associated with the request.
- Submit all completed documents listed above to the Local Structure Access Team.
IMPORTANT: Some areas may require additional documents beyond what is outlined above. Please reach out to the Local Structure Access Team to ensure you have all required documentation for a complete request prior to submittal.
Submit a request for an emergency conduit reservation
- Complete the Request for Emergency Conduit Reservation (EMER-002) form.
- Complete a Manhole/Vault Access (MHACC-002) for each manhole associated with the request that will require entry for facility placement.
- If the request proposes core boring a manhole, complete the Request to Core Bore or Modify Manhole (CORE-002) form for each manhole where you are proposing to core bore or modify the manhole.
- Create a map of the proposed path that includes all manholes associated with the request.
- Submit all completed documents listed above to the Local Structure Access Team.
IMPORTANT: Some areas may require additional documents beyond what is outlined above. Please reach out to the Local Structure Access Team to ensure you have all required documentation for a complete request prior to submittal.
Request make ready for AT&T attachments on a non-AT&T owned pole
To request make ready be performed for AT&T attachments on a non-AT&T owned pole, provide your name, address, phone number, email address, and a brief desciprition of the work requested to the appropriate contact listed below:
State | Phone | |
---|---|---|
AL, FL, GA, IL, IN, KY, LA, MI, MS, NC, OH, SC, TN, WI | gen1361@att.com | 888-901-2779 |
CA, NV | g24685@att.com | 888-964-7072 |
AR, KS, MO, OK, TX | g12599@att.com | 888-964-7072 |
Notify AT&T of One Touch Make Ready construction start or completion affecting AT&T attachments on foreign owned (FO), non-AT&T poles
Upon receiving an OTMR permit from the pole owner to perform make-ready construction affecting AT&T attachments on a non-AT&T owned or jointly owned pole, Attaching Party must provide notification of the start date and completion date of all make-ready work performed on AT&T attachments as follows:
- Prior to performing the permitted make-ready affecting AT&T attachments, Attaching Party will complete the AP Notification of MR Construction Start date FO Poles form and submit it to the issuer of the permit.
- Upon completion of the permitted make-ready on AT&T attachments located on an AT&T pole (or AT&T owned grade on a jointly owned pole), Attaching Party will complete the AP Notification of MR Construction Complete date FO Poles form and submit it to the Local Structure Access Team.
Invoke the self-help remedy for make-ready work affecting AT&T attachments
When an Attaching Party elects to invoke the self-help remedy for make-ready work affecting AT&T attachments, Attaching Party must provide notification of the start date and completion date of all make-ready work performed on AT&T attachments as follows:
- AT&T Owned or Jointly Owned Poles
- Prior to performing the permitted make-ready on AT&T attachments located on an AT&T pole (or AT&T owned grade on a jointly owned pole), Attaching Party will complete the AP Notification of MR Construction Start date ATT Poles form and submit it to the issuer of the permit.
- Upon completion of the permitted make-ready on AT&T attachments located on an AT&T pole (or AT&T owned grade on a jointly owned pole), Attaching Party will complete the AP Notification of MR Construction Complete date ATT Poles form and submit it to the issuer of the permit.
- Foreign Owned (FO), Non-AT&T Owned Poles
- Prior to performing the permitted make-ready affecting AT&T attachments, Attaching Party will complete the AP Notification of MR Construction Start date FO Poles form and submit it to the issuer of the permit.
- Upon completion of the permitted make-ready on AT&T attachments located on an AT&T pole (or AT&T owned grade on a jointly owned pole), Attaching Party will complete the AP Notification of MR Construction Complete date FO Poles form and submit it to the Local Structure Access Team.
Notify AT&T of my removal of attachment(s)
When Attaching Party no longer intends to occupy space in or on AT&T's structure, Attaching Party must provide written notification to AT&T by completing Notification of Surrender or Modification of Attachment License form and submit it to the Local Structure Access Team.
Access and view my Structure Access billing
- Lease Billing (Annual/Semi-annual)
- The following job aid provides instructions on how to access your annual/semi-annual Structure Access invoice(s): Annual/Semi-Annual Invoice Retrieval Job Aid
- For questions or disputes associated with your annual/semi-annual lease billing from IBIS or LSB:
- Email: lsbinquiries@att.com
- Hotline: 1-855-549-2111 (IBIS and LSB inquiries only)
- Project Construction Billing
- To pay your project construction bill online, navigate to https://www.att.com/acctsvcs/fastpay
- For questions concerning your project construction billing, please reach out to the AT&T Collections team at 1-888-827-3237.
- Disputes associated with your project construction bill should be directed to the AT&T Project Manager associated with your request.
AT&T authorized contractors
- Civil Engineering for conduit/pole attachment
- Conduit cable/duct placement
- Conduit or Pole attachment pre-construction survey
- Pole attachment make-ready work
Become an AT&T authorized contractor
Contractors wishing to become an AT&T authorized contractor must reach out to the appropriate contact listed below:
Area | Contact Name | Contact Email |
TX: Dallas/Fort Worth, Houston | Paul Hensley | ph2843@att.com |
TX: Austin | Corey Cahill | cc7843@att.com |
TX: South Texas | Steve Hintzel | sh5448@att.com |
OK | Robin Taylor | rt7284@att.com |
AR, MO, KS | Mike Pauls | mp1232@att.com |
NV | Esmeralda Morales | em891s@att.com |
CA | Erika Dubois | ej2812@att.com |
IL, IN, KY, MI, OH, TN, WI | David McCarty | dm8215@att.com |
AL, FL, GA, LA, MS, NC, SC | Craig Beasley | cb0604@att.com |
Area | Contact Name | Contact Email |
TX: Dallas/Fort Worth | David Buford | db3524@att.com |
TX: Austin | Corey Cahill | cc7843@att.com |
TX: South Texas | Steve Hintzel | sh5448@att.com |
TX: Houston | Christina Daniel | cc7984@att.com |
OK | Robin Taylor | rt7284@att.com |
AR, KS, MO | Mike Pauls | mp1232@att.com |
CA: Sacramento | Rebbeca Robideaux | rr3159@att.com |
CA: Los Angeles, Southern California | Jonine Lowery | jr3217@att.com |
CA: Fresno | Esmeralda Morales | em891s@att.com |
CA: North Bay, South Bay | Mike Wabakken | mw1325@att.com |
NV | Esmeralda Morales | em891s@att.com |
IN, MI, WI | Dewey Drumm | dd1734@att.com |
IL, KY, OH | Chad Catlett | cc7569@att.com |
AL | Stacey Scarboro | ss0031@att.com |
AL | Lynn Wallace | lw8449@att.com |
FL, LA | Greg Kessell | gk9318@att.com |
MS | Sam Alpeyeva | sg202a@att.com |
MS | Lynn Wallace | lw8449@att.com |
GA, SC | Stacey Scarboro | ss0031@att.com |
GA, SC, NC | Scott Beazley | sb3588@att.com |
NC, TN | Sam Alpeyeva | sg202a@att.com |
TN | Eric James | ej5673@att.com |
Attacher authorized contractors
- Within the communications space:
- Above the communications space:
Add an Attacher authorized contractor
IMPORTANT: An Attaching Party wishing to add an Attacher authorized contractor must have an existing executed agreement (Category B agreement or FCC agreement) that contains the FCC 18-111 provisions.
If you do not currently have an agreement with the FCC 18-111 provisions and would like to amend your agreement to have them added, follow the Structure Access Agreement amendment process.
Complete the Applicant Submission of Authorized Contractor form and submit it to the email address listed on the form. Refer to the Applicant Submission of Authorized Contractor Instructions document for instructions on completing the Applicant Submission of Authorized Contractor form.
View the current AT&T Structure Access rates
The current AT&T Structure Access rates:
Contacts | top | ||
---|---|---|---|
Points of Contact |
Guidelines | top | ||
---|---|---|---|
Revised: 07/31/19 | Guidelines for Boxing and Bracketing | ||
Revised: 01/03/25 | Annual/Semi-Annual Invoice Retrieval Job Aid | ||
Revised: 10/31/23 | Structure Access Application Process | ||
Revised: 05/29/24 | Structure Access Guidelines |
Forms | top | ||
---|---|---|---|
Revised: 08/07/23 | Assignment Request Form | ||
Revised: 08/02/24 | Structure Access Negotiations Request Form | ||
Revised: 08/21/24 | Application (APP-002) | ||
Revised: 03/15/21 | Conduit Data Sheet (COND-001) | ||
Revised: 10/17/23 | Letter of Authorization for Applications, Record Reviews, Billing & Notices (LOA) | ||
Revised: 03/15/21 | Manhole Detail Requirements (MHDET-001) | ||
Revised: 03/15/24 | Manhole/Vault Access (MHACC-002) | ||
Revised: 03/23/22 | Notification of Surrender or Modification of Attachment License (SUR-MOD) | ||
Revised: 08/15/24 | Notification to Overlash/Rebuild (NOR) | ||
Revised: 03/15/21 | Pole Data Sheet (POLE-DATA-003) | ||
Revised: 08/01/18 | Pole Data Sheet Instructions | ||
Revised: 05/29/24 | Records Review Request (REC-REV-002) | ||
Revised: 03/15/21 | Request for Emergency Conduit Reservation (EMER-002) | ||
Revised: 03/15/21 | Request to Core Bore or Modify Manhole (CORE-002) |
Attacher Notification of Construction Start and Completion forms | top | ||
---|---|---|---|
Revised: 12/07/21 | AP Notification of MR Construction Complete date ATT Poles | ||
Revised: 12/07/21 | AP Notification of MR Construction Complete date FO Poles | ||
Revised: 12/07/21 | AP Notification of MR Construction Start date ATT Poles | ||
Revised: 12/07/21 | AP Notification of MR Construction Start date FO Poles |
FCC 18-111 Order Forms | top | |||
---|---|---|---|---|
Please Note: | ||||
* These forms are only to be used if an Attaching Party has an executed Category B or FCC Agreement and wishes to invoke any part of the FCC 18-111 Order. An Attaching Party wishing to execute a new, or amend an existing, Structure Access agreement to include these provisions must submit a request per the New Agreement Negotiation Process listed on this page. | ||||
Revised: 07/28/23 | Application (APP-002) | |||
Revised: 07/30/24 | Applicant Submission of Authorized Contractor Instructions | |||
Revised: 07/30/24 | Applicant Submission of Authorized Contractor | |||
Revised: 07/12/23 | Notification to Overlash/Rebuild (NOR) |
AT&T Authorized Contractor List | top | ||
---|---|---|---|
Revised: 10/29/24 | Civil Engineering for conduit/pole attachment | ||
Revised: 10/29/24 | Conduit cable/duct placement | ||
Revised: 10/29/24 | Conduit or Pole attachment pre-construction survey | ||
Revised: 10/29/24 | Pole attachment make-ready work |
Attacher Authorized Contractors Within the Communications Space | top | ||
---|---|---|---|
Revised: 12/02/24 | POLE-MAKE-READY-IN-COMM-SPACE | ||
Revised: 10/07/24 | POLE-SURVEY |
Attacher Authorized Contractors Above the Communications Space | top | ||
---|---|---|---|
Revised: 07/03/19 | Pole Make ready Above Comm Space |
Rates and Optional Agreements | top | ||
---|---|---|---|
Rates and Optional Agreement |
AT&T Facility Portal | top | ||
---|---|---|---|
Revised: 04/02/24 | AT&T Facility Portal Access Instructions | ||
Revised: 04/02/24 | AT&T Facility Portal Access Agreement | ||
Revised: 04/02/24 | AT&T Facility Portal Glossary | ||
Revised: 04/02/24 | AT&T Facility Portal FAQ | ||
Revised: 04/02/24 | AT&T Facility Portal Security Questions and Response | ||
Revised: 04/02/24 | AT&T Facility Portal Pole Data Retrieval and Attachment Data Upload Job Aid | ||
Revised: 04/02/24 | Pole Attachment DB Phase 2 Schema Details | ||
Revised: 06/24/24 | FUTURE – Facility Portal Pole Information Report Job Aid | ||
Revised: 06/24/24 | FUTURE – Facility Portal Pole Attachment Request Job Aid | ||
Revised: 06/24/24 | FUTURE – Facility Portal Conduit Attachment Request Job Aid |
Regional | top | ||
---|---|---|---|
Revised: 07/31/19 | West-AT&T CA Conduit Mapping Protocol | ||
Revised: 07/31/19 | West-AT&T California Structure Access Protocol Addendum, | ||
West-California General Order | |||
Revised: 05/05/20 | West-AT&T CA Max Grade\Conduit Map Req Form | ||
Revised: 05/05/20 | West-AT&T CA Non-Disclosure Agreement | ||
Revised: 08/21/20 | West – Make Ready Form | ||
Revised: 09/29/20 | West – Applicant Notice |